Emergency electrician services UK Options
The MCBs ought to be clipped on to the Din bar as well as the busbar into a current flowing terminal and tight screwed to provide latest into the MCBs.Two sixteen/25mm tail cables, 1 neutral and the opposite active are linked to the key double pole switch in the meter. The primary earth cable need to be screwed to the earth block, and The existing-